VIRTUS Data Centres are one of the UK’s fastest growing data centre providers, offering more efficient and flexible facilities to their clients. They are an industry leader in hyper efficient, ultra-high density and highly interconnected facilities.
1.5kW
high density
4.2mw
Total IT Power
2900m²
net technical space
VIRTUS Data Centres required the Design & Build of a secure data centre for their primary site in Enfield, London. A single storey facility, comprising of over 6,360m2 ground floor area, including plant room, the data centre will be a reliable and carrier neutral colocation facility, with maximum flexibility and adaptability for clients.
Our Solution
Bouygues Energies & Services were appointed as the turnkey Design & Build partner for the Enfield mission critical facility, delivering world-class connectivity with access to high speed, resilient networks.
Built to enhanced Tier 3 specifications with a range of Tier 1 and Tier 2 carriers, our innovative solution included full range of colocation, interconnection, support and monitoring services, offering VIRTUS’ clients a resilient and secure, world-class, carrier neutral colocation facility. Our design included 11 self-contained collocation Data Halls and 2,900m2 of net technical space.
The facility is served by resilient 8MW 11kV diverse feeds from the National Grid, so key features of the design included bespoke power deployments available to meet in excess of 2kW per square, including a power usage efficiency (PUE) rating of less than 1.5.
In order to meet the client’s high level security and resilience requirements, our solution also incorporated many industry-leading features, such as centralised N+N in line UPS plant; N+1 HV standby diesel generator; N+1 CRAC units; and dual A&B UPS supplies, with 10 minutes autonomy at full load. We also installed advanced alarms and monitoring systems to ensure the integrity of the data centre.
Client Benefits
A Single Point of Contact to Boost Performance
Providing detailed design, architectural, procurement, construction, installation, mechanical & electrical services and Integrated System Testing (IST), to offer seamless engineering solutions to the challenges facing our client.
Green Credentials
VIRTUS’ data centre is designed to achieve BREEAM “Good” standard and maximise utilisation of renewable energy sources.
Energy Efficiency
With a PUE of <1.5, the facility supports VIRTUS’ goals of being the energy efficient data centre provider of choice.
Ultra-Secure Facility
The data centre provides a fully integrated security solution with 100 per cent uptime; protecting and connecting data, the building and its assets.
Flexible Solutions
Offering clients variety in deployment of IT solutions; from single rack or cabinet in a shared space, to a bespoke data centre suite with dedicated power and cooling. The range of power density solutions available reaches up to 15kW per cabinet without in-row cooling.
Latest case studies
- Bouygues Energies & Services were approached to design and build their new data centre at VIRTUS' impressive Stockley Park Campus.Industry
- Bouygues Energies & Services were appointed as the turnkey partner for the refurbishment and upgrade of an operational computer room.Industry
- Bouygues Energies & Services were approached to design and build their new, flagship data centre in Hayes, London.Industry
Commitments - Data Centre
Our Commitments

Performance
Delivering the highest level of efficiency, resilience and industry leading PUEs
Scalable
Tailored solutions which meet the requirements of flexibility and modularity, supporting your growth strategy
Zero Downtime
Delivering the highest levels of availability for your infrastructure and assets
Sustainability
Integrating the latest technology and applications with sustainable design, to achieve BREEAM and LEED certifications
Latest news
Find all the topics that make Bouygues Energies & Services news: projects, innovations, public and client events, partnerships, press releases ...
-
-
- Bouygues E&S celebrates first-ever TopSite award!
- We are excited to announce the launch of Orbiter™ by Bouygues Energies & Services.
-
-
-
-
- Supporting Digital Transformation for Improved Decision-Making and Building Performance Optimisation
- At BYES, we are committed to championing gender equality.
- By supporting them to achieved their Uptime Institute accreditation
-
-
- The School is the result of a collaboration between clients, contractors and suppliers
-
-
-
-
- International Women’s Day #BreakTheBias
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- Today is ‘Earth Overshoot Day’. This is the point in each year when humans have used up a full year’s worth of resources
- At Bouygues Energies & Services, as well as increasing the electric vehicles in our fleet and using telemetry to enable more efficient driving, we also equip our staff with tips to help reduce their carbon footprint while on the road. If you’re keen to reduce your carbon footprint while driving, here are some key tips that will also save you money on your fuel bill in the process!
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- TO STRENGTHEN ITS EXPERTISE IN INDUSTRY 4.0
-
-
-
-
-
-
-
-
-
-
- Bouygues Energies & Services have helped plant over 235 trees in Malawi with the help of Fruitful Office
-
-
-
-
-
- Earlier this week we spoke to Jo Adams, one of our lead Interior Designers
-
-
-
-
-
-
- Bouygues Energies & Services support Bouygues Construction is continuing to sow its seeds in Australia.
- Each year we hold our internal Sustainability Awards open to all our people within Bouygues & Energies Services UK.
-
- Food sustainability is about culture, health, equity and respect for the planet we live on.
- We see you as more than a number…
- Interview with Adeel Aslam, Technical Director, Bouygues Energies & Services, Contracting
- where we provided a solution to help improve the internal air quality
-
- 7100 m² of data storage in the heart of Marseille’s port district
- One for the diary, 11th November 2020, 2pm - 3pm (GMT)
-
- Provide renewable energy produced from the North Sea Wind Farms to homes across Germany by 2024.
-
-
- Pre-fabrication modular block: The paradigm shift to build a data centre differently?
- A virtual celebration to thank our supply chain
-
-
- Find out why we're prioritising electric vehicles
-
-
- There has always been a huge importance on reducing our Global footprint, to ensure a sustainable future
- A day for employers across the country to advocate their support for responsible employment.
- We have signed a first of its kind deal with Airlite, an innovative paint company
- Top tips to reduce you carbon footprint while working from home
-
- Along with 17 other companies the Data Centre team undertook a number of high-level fundraising activities in aid of CRASH charity.
- On this project we will be using our new innovative modular solution to help achieve the quality, speed to market..
- Sustainability can be a uniting theme and in this context great partnerships can be built between universities and the private sector.
- Leon wins the Sustainability Awards!
- We've helped Manchester Cares get closer to their £10,000 target
-
- We're providing a safe long term solution to protect our healthcare workers
- We’ve contributed to over 23,000 fruit portions, 600 fruit baskets being delivered to NHS hospitals.
- Some of our team members share their experiences during Covid-19.
- We've been recognised for our approach to health and safety
- Well done to our four team members that have made the finals!
- The Most Effective Development to a Wellbeing Strategy
-
- ExCel London on the 11th – 12th March 2020
- Bouygues Energies & Services are Exhibiting at this year’s Data Centre World
-
-
-
-
-
- Project Manager Aaron Yule will lead the team in charge of transforming Ashford's lighting.
-
-
-
-
-
- Gold Award for our continued focus on sustainability
- We're exhibiting at this year’s 2019 ISPE Europe Pharma 4.0 Conference, 20 - 21 November 2019, Manchester, Old Trafford.
- We have successfully renewed our Cyber Essentials Plus certification for the whole organisation.
- Virology Research Laboratory extension for AstraZeneca
-
-
- Bouygues Energies & Services are Exhibiting at this year’s DCD Event, 5 -6th November 2019, Old Billingsgate, London.
- David Carr presents his thought leadership piece.
- VIRTUS is the fastest growing Data Centre provider in the UK.
- We're encouraging our staff to share their work stories on social media.
- Bouygues Energies & Services are pleased to announce they are supporting DATACENTRE.ME!
- We're developing an energy project that will transform St Ives Park & Ride into a renewable energy generator.
- We will be presented the award by HRH Princess Anne
-
- Bouygues Energies & Services get moving with the Virgin Pulse
- Bouygues Energies & Services Data Centre team took part in The 21st Dragon Boat Challenge.
-
-
- We're looking for innovative startups to help create the campus of tomorrow!
- We hosted a construction skills academy for local people in Tower Hamlets.
- We're supporting the special Olympics and the great work it does to support 10,000 athletes.
-
- Brent are saving money, saving carbon and creating a safer place to live and work.
-
- Working with young people means that for us, wellbeing is as much of a priority as security.
- Employees have been busy spreading the festive cheer, with Christmas fundraising.
- We have won the award in recognition of our sustainability initiatives.
- We are collaborating with the whole Bouygues Construction Group in the UK to host Health & Safety Day 2018.
- Bouygues Energies & Services are delighted to announce the successful handover of the VIRTUS LONDON5 facility.
- With Sun'R we have combined our skills to support Lamagistère in its energy transition.
- We continue to grow our successful partnership, with further orders from VIRTUS.
- Axione becomes the 86th member of the altnet cooperative.
- Commercial partnership signed between us and Bosch France
- James Williams tells us about his role at Bouygues Energies & Services as a Process Engineer.
- We are delighted to announce a new contract with VIRTUS Data Centres.
- Sustainability initiative for Chelsea and Westminster NHS Foundation Trust.
- What makes a 'good' data centre?
- Bouygues Energies & Services commits to eliminating all single-use plastics from supply chain.
- What do our apprentices really think?
- with Geology graduate, Connor Cassley.
- Bouygues Energies & Service feature in Innovators magazine's biotech special.
- with Interior Architecture and Design undergraduate, Hollie.
- Graduate Trainee, Chris Nicolaou, talks about his experience working in Procurement.
- Bouygues Energies & Services awarded FM Contract with Slough Borough Council
- Bouygues Energies & Services is delighted to achieve certification of the revised ISO 9001 and ISO 14001.
- Bouygues Energies & Services awarded new contract to continue providing Facilities Management to UAL.
- Bouygues E&S Contracting UK Ltd win prestigious RoSPA Gold Award
- Bouygues Energies & Services celebrate the grand opening of our new Scottish office.
- Bouygues Energies & Services engineers go back to school to inspire the next generation of engineers.
- Bouygues Energies & Services partner with Flybits to deliver the connected workplace of the future.
- Bouygues Energies & Services celebrate female engineers on international Women In Engineering Day.
- Bouygues Energies & Services win Considerate Constructors Scheme Bronze medal.
- Bouygues Energies & Services are showcasing at Data Centre World 2017
- We have delivered a £1.3M refurbishment at Barnet Hospital.
- Bouygues Energies & Services Partnering Approach with Biotechnology Stakeholders.
- We're proud to be on the CCS’ TMT2 Framework Agreement.
- Strengthening Supply Chain Partnerships Under the Wings of Concorde
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196